DR.WANG Mathematics中文

2024 AMC 10A · Question 8

Arithmetic · rate · date and time

Problem outline

Three workers begin at 1 PM and pack 4, 3 and 3 boxes respectively every three minutes. A fourth worker later joins and packs five boxes every four minutes. The total at 2:45 PM is 450. When did the fourth worker start?

Show answer and methods 1 methods

Answer

A. 1:25 PM.

Method 1 Separate the original team’s work
Topics usedWork rates

The initial three work for 105 minutes, making (105/3)(4+3+3)=350(105/3)(4+3+3)=350 boxes. The remaining 100 are the fourth worker’s contribution.

At 5/45/4 boxes per minute that takes 100⋅4/5=80100\cdot4/5=80 minutes. Subtracting 80 minutes from 2:45 PM gives 1:25 PM.

Source and attribution

The outline and worked methods on this page were prepared for DR.WANG Mathematics.

Original question (external)